Document Type
Article
Publication Date
9-2015
Department
Engineering
Keywords
accelerated bridge construction, connection, experimental, girder, large scale, seismic
Abstract
To promote accelerated bridge construction in seismic regions, a large-scale experimental investigation was conducted to examine the seismic sufficiency of precast concrete I-girders in integral bridge super-structures. Such structures are not frequently used in high seismic regions due to lack of design guides and overly conservative design approaches. A half-scale,17.8 m (58.5 ft) long test unit modeling a portion of a prototype bridge incorporating a concrete column, ten I-shaped precast concrete girders, and an inverted-tee concrete cap beam was used to experimentally verify that precast concrete members employing accelerated construction techniques can be used in integral super-structures and provide excellent seismic performance. Comparison of an as-built girder-to-cap connection detail with an improved detail shows that the as-built detail in existing bridges will satisfactorily resist positive and negative seismic moments and allow plastic hinges to develop at the column tops, though this was not the original design intent. However, the improved detail, which exhibited excellent seismic moment resistance, is recommended for new bridges to avoid potential deterioration of the girder-to-cap connection.
Source Publication Title
PCI Journal
Publisher
Precast/Prestressed Concrete Institute
Volume
60
Issue
5
First Page
76
DOI
10.15554/pcij.09012015.76.95
Recommended Citation
Vander Werff, J. R., Snyder, R., Sritharan, S., & Holombo, J. (2015). A Cost-Effective Integral Bridge System with Precast Concrete I-Girders for Seismic Application. PCI Journal, 60 (5), 76. https://doi.org/10.15554/pcij.09012015.76.95
Comments
Online access available here.